FACTORY-DIRECT SUPPLY · GCC PROJECT SOURCING
Large diameter API 5L line pipe prepared for GCC project shipment

API 5L Line Pipe for GCC Projects — Factory-Direct Supply from China

Yuxinda is the factory-established export team for its Tianjin production base. For UAE, Saudi Arabia, Oman and Qatar projects, the team reviews API 5L PSL1/PSL2 scope, inspection, documents and loading under one integrated industrial-trade supply model. MOQ is 28 metric tonnes, FOB any Chinese port.

Important boundary: this is China export supply, not a UAE or GCC local warehouse. Ports, Incoterm, delivery schedule and any local partner must be confirmed for the specific order.

Last reviewed: 15 November 2026.

UAE · Saudi · Oman · QatarPSL1 / PSL2Seamless / LSAWEN 10204 3.1MOQ 28 t
DIRECT ANSWER

China project supply without pretending to be a local stockist

GCC buyers comparing suppliers need to know where the pipe is produced, who signs the mill certificate, where inspection is performed and who controls export documents and loading. Yuxinda answers those points directly instead of presenting a Chinese project supply as local UAE stock.

Importer and distributor supplyEPC project packagesOil and gas transmissionWater and utility pipe28 t mixed trial orders
API 5L line pipe loading plan for an international project
Production, inspection, documents and loading are coordinated as one order.
Supply responsibility

Who controls what

The producing factory and export company work as one accountable team, while original manufacturing responsibility remains traceable.

AreaResponsibilityBuyer evidence
ProductionTianjin production base plans and manufactures the approved pipe route.Heat, lot and pipe traceability; original manufacturer records.
International specificationYuxinda reviews the project standard, PSL, grade, dimensions, coating and inspection requirements.Technical clarification and controlled quotation.
InspectionThe factory performs required tests; buyer-nominated SGS, BV, Intertek, TÜV or another inspector can attend where agreed.ITP, witness/hold points, test and inspection reports.
Documents and loadingYuxinda coordinates MTC, export documents, packing and loading records.Certificate pack, packing list, invoice, B/L and loading evidence.
Published scope

What can be reviewed for a GCC project

The line list and governing project specification decide the final scope.

RoutePublished rangeCommon project controls
API 5L commercial reviewPSL1 and PSL2 requirements through X70, with larger LSAW grades where approved.Manufacturer, production route, delivery condition, certificate, dimensions and testing checked per order.
Certificate routeMatched to the actual producing mill and product form.Original qualification evidence reviewed during supplier and order verification.
LSAWGr.B/L245 through X80/L555 where approved; OD 406–1422 mm.Plate/weld traceability, weld NDT, hydrostatic test and coating inspection.
PSL1 B–X70Seamless or LSAW route subject to size and review.Confirm the applicable edition and any purchaser supplement before quotation.
GCC logistics

Ports and commercial basis

The following are commonly named destination ports; they are not a claim of local stock or a fixed shipping route.

Ports buyers commonly name

  • UAE: Jebel Ali, Khalifa
  • Oman: Sohar, Duqm, Muscat
  • Saudi Arabia: Dammam, Jubail, Jeddah
  • Qatar: Hamad

Commercial data to send

  • Product, PSL, grade and construction route
  • OD × wall × length and end preparation
  • Metric tonnes, destination port and Incoterm
  • Coating, impact temperature, NDT and third-party inspection

Reference price: USD 690–780 per metric tonne FOB any Chinese port for standard bare line pipe. Coating, third-party inspection, freight, insurance and bank charges are excluded; the signed contract governs.

Evidence pack

Documents to align before production

EN 10204 3.1, third-party inspection and document scope are separate requirements and must all be defined.

✓

MTC 3.1

Manufacturer-issued certificate for the contract and production batch.

✓

Inspection plan

Method, coverage, witness and hold points agreed before production.

✓

Export documents

Packing list, invoice, B/L and certificate of origin.

✓

Loading records

Count, packing and photographs recorded before departure.

View inspection and document guide

Questions

GCC API 5L project supply

Is Yuxinda a local stockist in the UAE or GCC?
No. Yuxinda is a factory-established export team based in Tianjin, China. The page covers China export supply to GCC projects and does not claim a local warehouse, office or stock position in the GCC.
Which API 5L products can be reviewed for a GCC project?
API 5L PSL1 and PSL2 projects are reviewed across SAWL, seamless and approved large-diameter routes, including X42–X70 requirements and larger LSAW grades where approved. Final supply, manufacturer and certificate follow the actual PSL, grade, construction, dimensions, delivery condition, testing and purchase order.
Which documents can be coordinated for a GCC API 5L order?
A manufacturer-issued EN 10204 3.1 MTC for the corresponding contract and production batch, export documents and buyer-nominated third-party inspection coordination. Required NDT, hydrostatic, coating and inspection reports are agreed before production.
Can a 28 metric tonne mixed order be reviewed?
Yes. The published MOQ is 28 metric tonnes, and different sizes and grades can be reviewed in one order subject to the final specification, production review and signed contract.
Can SGS, BV or TÜV inspection be coordinated?
Buyer-nominated third-party inspection by SGS, BV, Intertek, TÜV or another agreed inspector can be coordinated. The inspection standard, scope, witness points and acceptance criteria must be stated in the enquiry and order documents.
What information is needed for a GCC quotation?
Send standard and edition, PSL, grade or state, OD, wall, length, quantity, coating, impact temperature, NDT and inspection requirements, destination port and Incoterm. A tender document or line list is preferred.
💬Chat on WhatsApp↑